Draft Development Control Plan – Wollongong Development Control Plan 2009 Chapter D21 Tallawarra Lands

Share Draft Development Control Plan – Wollongong Development Control Plan 2009 Chapter D21 Tallawarra Lands on Facebook Share Draft Development Control Plan – Wollongong Development Control Plan 2009 Chapter D21 Tallawarra Lands on Twitter Share Draft Development Control Plan – Wollongong Development Control Plan 2009 Chapter D21 Tallawarra Lands on Linkedin Email Draft Development Control Plan – Wollongong Development Control Plan 2009 Chapter D21 Tallawarra Lands link

Consultation has concluded

Council is seeking feedback on a draft Development Control Plan (draft DCP Chapter D21) for land surrounding the Tallawarra power station. If adopted by Council, the draft DCP will become Chapter D21 of Wollongong Development Control Plan 2009. Council resolved on 8 May 2023 to place the draft DCP Chapter D21 on public online exhibition.

Background

The Tallawarra Lands Concept Plan (Concept Plan) was approved on 23 May 2013 for a mixed-use development including residential, commercial, industrial, retail and public open space, along with conservation areas, and was modified in 2020. The key elements of the modification included an increase in the number of potential residential lots in the northern and central precincts by reducing the minimum lot size and increasing the urban footprint and modifying specific conditions of consent to enable the northern and central precincts to be developed independently of the southern precinct. The current owners of the site (Energy Australia) have entered into an agreement with BridgeHill (Tallawarra) Pty Ltd (BridgeHill) for the ultimate development of two of the three Precincts indicated within the Concept Plan for the site. The southern precinct is proposed to be retained within Energy Australia (EA) ownership until contamination issues associated with the previous Tallawarra Coal Fired Power Station are addressed and completed. As such, this precinct is not expected to be developed in the foreseeable future.

The draft DCP Chapter 21 is on exhibition from Monday 13 November to Wednesday 13 December 2023 and can be viewed:

To find out more:

Share your thoughts by:

  • Completing the online form
  • Emailing records@wollongong.nsw.gov.au
  • Writing to The General Manager, Wollongong City Council, Locked Bag 8821 WOLLONGONG DC NSW 2500
  • Phoning the Strategic Project Officer - City Strategy on 4227 7111

Please provide your feedback by 13 December 2023. For written, phone and emailed submissions, please quote: 'Draft Development Control Plan – Chapter D21 Tallawarra Lands'. Any submissions become public documents and may be viewed by other persons on request. Please read Council's Privacy Policy before submitting your feedback.

Accessibility and language assistance

If you’re d/Deaf, hard of hearing or have a speech or language difficulty, you can contact us through the National Relay Service. If you need an interpreter, you can contact us through the Translating and Interpreting Service on 131 450. You’ll need to provide our phone number 02 4227 7111 for either service.

Council is seeking feedback on a draft Development Control Plan (draft DCP Chapter D21) for land surrounding the Tallawarra power station. If adopted by Council, the draft DCP will become Chapter D21 of Wollongong Development Control Plan 2009. Council resolved on 8 May 2023 to place the draft DCP Chapter D21 on public online exhibition.

Background

The Tallawarra Lands Concept Plan (Concept Plan) was approved on 23 May 2013 for a mixed-use development including residential, commercial, industrial, retail and public open space, along with conservation areas, and was modified in 2020. The key elements of the modification included an increase in the number of potential residential lots in the northern and central precincts by reducing the minimum lot size and increasing the urban footprint and modifying specific conditions of consent to enable the northern and central precincts to be developed independently of the southern precinct. The current owners of the site (Energy Australia) have entered into an agreement with BridgeHill (Tallawarra) Pty Ltd (BridgeHill) for the ultimate development of two of the three Precincts indicated within the Concept Plan for the site. The southern precinct is proposed to be retained within Energy Australia (EA) ownership until contamination issues associated with the previous Tallawarra Coal Fired Power Station are addressed and completed. As such, this precinct is not expected to be developed in the foreseeable future.

The draft DCP Chapter 21 is on exhibition from Monday 13 November to Wednesday 13 December 2023 and can be viewed:

To find out more:

Share your thoughts by:

  • Completing the online form
  • Emailing records@wollongong.nsw.gov.au
  • Writing to The General Manager, Wollongong City Council, Locked Bag 8821 WOLLONGONG DC NSW 2500
  • Phoning the Strategic Project Officer - City Strategy on 4227 7111

Please provide your feedback by 13 December 2023. For written, phone and emailed submissions, please quote: 'Draft Development Control Plan – Chapter D21 Tallawarra Lands'. Any submissions become public documents and may be viewed by other persons on request. Please read Council's Privacy Policy before submitting your feedback.

Accessibility and language assistance

If you’re d/Deaf, hard of hearing or have a speech or language difficulty, you can contact us through the National Relay Service. If you need an interpreter, you can contact us through the Translating and Interpreting Service on 131 450. You’ll need to provide our phone number 02 4227 7111 for either service.